Stair Layout in Split-Level Interiors: Approaches and Landings in 3 Cases

A split-level layout needs room to approach the stairs below and turn into the upper floor. Across 3 office and gym projects, we compare side passages, places where people stop at doorways, and routes alongside upper-level railings.

View through the upstairs glazing to the timber floor and brick wall of the Gasan office hall
Completed Gasan office. The lower hall is visible through the upper glazing.

Before you begin

  • Draw the paths of people climbing the stairs and people continuing past on the same floor plan.
  • Separate the room needed to open a door or turn beyond the last step from the footprint of nearby furniture.
  • Separate the stairs, railing and surrounding walls from movable furniture to identify which changes are needed.

Gasan 31-pyeong office: a passage beside the stairs

The Gasan office lower hall with timber flooring, a curved counter and glazing above
The completion photo shows how the hall in front of the counter relates to the upper level.

The Goodterior Gasan 31-pyeong split-level office project lists an area of 31.47 pyeong. Its completion photos show the stairs running along the windows, with a timber-floored passage continuing from the hall alongside them. The counter and the stair are on different sides of the hall in the project photos. This gives you a way to map where someone at the counter would stand and how someone heading upstairs would cross the same room.

If you are considering a similar arrangement, draw where a person approaching from the hall would stand at the bottom step before committing to the location along the windows. Add someone continuing alongside the stairs and someone coming back carrying a box. Even when the paths share the same floor, the places where those people turn affect where furniture can go. Keep those paths clear when trying out a waiting chair or movable table in the hall.

If you plan to change the flooring or order furniture, identify the finish that meets the existing stair and the movable pieces as separate items in the quote. When adjusting furniture alone, tape out its footprint and walk the approach to the stair and the turn into the hall on descent.

Goyang 79-pyeong office: stairs at the end of a corridor

Design rendering of the Goyang lower floor, with a glazed wall, a restroom door and the stairs at the corridor end
In the rendering, the corridor past several doors and a glazed wall leads to the stairs.

The Goodterior Goyang 79-pyeong split-level office design lists an area of 79.3 pyeong. This published plan links a lower lounge and meeting spaces with upper-level workstations. The rendering shows the stairs at the end of a corridor with a glazed wall and a restroom door. In this layout, people approach the stairs by following the corridor past the doors.

Where staff frequently use the corridor to reach their desks, consider what happens when chairs or supplies extend beyond a doorway. A visitor checking a meeting-room number can be standing outside a door as someone comes downstairs and turns toward another room. A plan drawn with every door closed makes it hard to see where people would have to stop. Mark how far the doors open and where someone would pause to read a sign. Compare sign positions that are visible before they start toward the stair.

When revising the corridor, check that it works for a single ascent and for several people leaving a meeting together. If staff move boxes or use carts, add the usual routes for those items and for movable furniture to the plan.

If a door along the corridor has controlled access during working hours, check how people would reach the stair while that door is locked. Signs added late can miss the direction from which they need to be read. Walk in from the entrance and check whether a moving door can hide the sign.

30-pyeong split-level gym: stairs and changing-room entrances

Timber wall and a doorway coming into view alongside the light-coloured stair in the 30-pyeong gym design
The rendering shows an interior doorway around the side of the stair.

The Goodterior 30-pyeong split-level gym design shows an exercise hall and an upstairs consultation space. Its project description puts the changing and shower areas behind the stair. The rendering shows a timber wall and an interior door beside the stair with a planter near the approach. Someone arriving from the hall can climb the stair or continue alongside it to reach the doorway. The continuous flooring gives little indication of where those paths diverge.

For a layout like this, list what a member needs to see when heading from the equipment to change and what someone arriving for a consultation needs to see when looking for the stair. If signs sit only on the doors, they may be hard to spot from the hall. Putting all the information in the hall can make people lean around someone using equipment to read it. Locate where each visitor would actually pause to read, then check whether that puts them in front of the stair or alongside it.

Movable objects such as the planter in the rendering are easy to overlook when estimating available walking space. Mark the directions used by people on nearby equipment and the actual positions of signs and planters before finalising equipment placement. If paths overlap, test relocating small items first. Keep wall or door changes distinct from furniture changes in the quote.

Three checks to make at both ends of the stair

Overhead design view of the upper Goyang office, with stairs at the lower left, a central opening and window-side desks
On the upper-level plan, trace where people go along the railing after coming off the stairs.

Begin by marking the first step and the busiest door on the lower-level plan. Where the hall continues alongside the stair, as in Gasan, identify where the paths split. Where the stair sits at the end of a corridor, as in Goyang, draw the swing of each door on the approach. Where there is a doorway behind the stair, as in the gym, check whether users can distinguish both directions from the point where the stairs come into view.

Upstairs, map where people step off and turn before marking furniture. In the Goyang upper-level view, the route follows the railing beside the opening to the workstations. Check the route with the nearest chair pulled out, someone coming up carrying a case or files, and someone waiting to descend. The upper floor needs its own space to pause and turn independently of what you allow below.

Mark the routes on site, open the doors and use the actual dimensions of the furniture. Distinguish issues you can address with signs or movable furniture from those that would require changes to the stair, railing or partitions. Take measurements at your own stair and where nearby doors and flooring meet it before deciding on the scope.

If the area around the stair is already in use, compare the start of the working day with a busy period for visitors. A spot where nobody normally stops can be blocked briefly during deliveries or when several people move together. Try setting aside a temporary staging spot for those occasions before reducing any fixed furniture.

Ask us about your interior project

We can discuss a quote and design suited to the space you are planning.

Request a free consultation
Back to the magazine

Project progress
LIVE

Project list
Loading map...
More project updates

Directions

Goodterior

Address
30 Beotkkot-ro 36-gil, Geumcheon-gu, Seoul
Units 1125 and 1126
Public transport
Gasan Digital Complex Station, Exit 63 minutes on foot
Loading map...