Goodterior logo
Goodterior logo

Corridor and Meeting Room Floors in 5 Offices in the 40-Pyeong Range

In an office in the 40-pyeong range, when deciding whether corridor and meeting room floors should run together or change at the door, review the swatches alongside the frame, the base of the glass partition, and the existing floor. Five built projects in Gwangmyeong, Osan, Songdo, and Ansan show how to choose where finishes meet.

Completed Osan office with a light gray corridor floor, a curved glass wall, and a row of planters
In the Osan office, the corridor floor runs past the curved meeting room into the open area.

Before you begin

  • Floor colors alone cannot establish the transition. Check how far the floor reads as continuous across the glass base, frame, and open door.
  • Similar grays can look different across rooms with different light. Lay swatches on both sides and note tile direction and joint positions on the drawing.
  • Where there is a folding door or a floor track, give the flooring and door trades the same finish line and height reference.

Gwangmyeong, 40 pyeong: Following the gray flooring along a long glass wall

Completed Gwangmyeong office with a long glass partition, translucent bands, a passage, and gray flooring beneath the glass
Look along the base of the glass to see how much of the room floor is visible from the passage.

In Goodterior’s Gwangmyeong 40-pyeong automotive office project, a long glass partition beside the corridor leaves part of the floor visible under its translucent bands. The project page identifies gray flooring throughout. The finished photograph shows a slim line at the base of the glass between the bright passage and the gray floor beyond. The boundary reads clearly without adding a strong color change.

In a long corridor, the line beneath the glass draws attention to the flooring seams. If you want a continuous appearance, mark the longest sightline from the start of the passage before setting the tile direction. If rooms will be laid separately, check the drawing for changes in cut-piece width at the glass or a change of grain midway down the corridor. A shared finish line makes it easier to compare both areas even if the work happens on different days.

Mark the long visible edge under the glass and the cut at the open doorway when requesting a quote. If a substitute has a different tile length, compare its actual dimensions as well as its color, since the quantity of offcuts may change.

Osan, 42 pyeong: Comparing gray floors in a sunlit meeting room and corridor

Completed Osan office with patches of sunlight on both sides of the low white glass frame
Sun crossing the glass changes how the floor and the narrow frame stand out.

Goodterior’s Osan 42-pyeong shopping mall office project shows light-gray flooring, white walls, and a glass partition with film across its lower portion. In the front photograph, sunlight passes the white frame and lands in rectangles on the floor. The floor can look lighter on one side, but that alone cannot establish a material change. If you want the two surfaces to match, seeing both swatches under one light source may be insufficient.

Lay the same swatch in the corridor and beside the meeting room window at the hours people will use the office. Compare lightness and check whether the joint shows under the glass frame. Treat the floor and the frame as one decision before adjusting furniture and storage colors to match the brightest spot. Repeat the observation in overcast light or with the lights on to see how much daylight contributes.

Songdo, 42 pyeong: Reading tile direction and joints at the glass doors

Completed Songdo office showing glass doors behind planters, gray flooring, and a copier at right
Read the floor joints against the glass doors to identify where tile cuts are needed.

Goodterior’s Songdo 42-pyeong office project separates work areas from rooms such as meeting spaces. A finished photograph shows glass doors and white frames beyond the corridor planters, with visible joints in the gray flooring. Where the door leaves the interior visible, a layout set only by the door width can produce different lines when viewed from the corridor and inside the room.

Draw the door centerlines together with the longest corridor line before laying the floor. If several entrances make a uniform pattern impractical, use the busiest visitor entrance as the reference and check the cut pieces at the other doors. At a copier or storage unit, look at the floor when the door is open and someone steps aside. If some existing flooring will stay, confirm its condition and mark where the repair will join it on both the plan and the site.

Songdo, 49 pyeong: Checking the frame before uncovering the floor

Songdo office during construction with blue tape holding floor protection and a wood-toned frame
The construction photograph shows floor protection in relation to the bottom of the door frame.

The public photographs of Goodterior’s Songdo 49-pyeong tax office project include a room frame installed while corridor protection still covers the floor. The blue line in the photograph is a construction marker. The protected floor can make the finished level hard to judge. If the move-in date is fixed, schedule a joint check of the frame and final flooring levels as well as keeping track of the handover date.

Coordinate finished floor thickness on both sides, clearance below the frame, the swing direction, and the finish line on one drawing. Whichever floor goes down first, leave a reference the next trade can use to check clearance before covering it. Where new flooring meets an existing finish, compare the two physical samples before ordering.

If workers need to use the corridor before handover, decide where and when to lift protection to inspect below the frame. Label shared photos as construction or finished views, and keep a second view showing the door open.

Ansan, 40 pyeong: Coordinating the floor track at a folding glass door

Completed Ansan office with folding glass panels, a metal floor track, and a meeting table
The flooring transition and track meet along the path of the folding panels.

Goodterior’s Ansan Sangnoksu 40-pyeong logistics office project shows folding glass panels partly open toward a meeting room. Below the panels, a metal track separates their path from the floor beneath the table. At this opening, the floor and moving door meet on the same line. Mark where the table, chairs and people will move before choosing the floor color so you can evaluate the opening with the door folded back.

Even if the corridor uses one floor color, tell the flooring trade where a track is planned. Check finished heights and the joining trim against the door selected for the site. After comparing the five projects, mark the longest corridor line, visible floor at each opening, flooring to retain, and the door type on the plan. Those decisions let you compare extending one floor against replacing only the room side on the same basis.

If the meeting room often stays open, try rolling a mobile whiteboard or cleaning equipment through in its usual direction. For an enclosed room with little wheeled traffic, compare the closing position and the finish line seen from the hall first.

Ask us about your interior project

We can discuss a quote and design suited to the space you are planning.

Request a free consultation
Back to the magazine

Project progress
LIVE

Project list
Loading map...
More project updates

Directions

Goodterior

Address
30 Beotkkot-ro 36-gil, Geumcheon-gu, Seoul
Units 1125 and 1126
Public transport
Gasan Digital Complex Station, Exit 63 minutes on foot
Loading map...